Theresa Marsh drawdown, dam repair will test Wisconsin duck hunters
Published: , in Outdoor News
Duck hunters will have a difficult time navigating on Theresa Marsh this fall with water levels dramatically lowered to allow construction and repair to the main dike that impounds nearly 1,500 acres of water at full pool.
Steffen Peterson is the Wisconsin DNR property manager at Theresa Marsh. He said the mile-long dike on either side of the dam on Rock River’s East Branch on the northwest side of the marsh was built in 1968 using soil near the site.
The post Theresa Marsh drawdown, dam repair will test Wisconsin duck hunters appeared first on Outdoor News.